Interpipe Logo
 
 
Architects and Designers Click Here

Architects and Specifiers please click here

Users and Fabricators Click Here

Users and Buyers please click here

  Latest News
     

Welcome to our news page. We have listed our latest news and industry events. Should you require any further information please don't hesitate to contact us.

Please click on a link, or alternatively scroll down the page.

Date   Story

2007 - February

  New Sizes Launched
2007 - January   BSI Confirms Specification
2006 - December   Heathrow Terminal 5
2006 - October   Investment leads to 30 minute turnaround

 

 

 

 

 


Elliptal Hollow Sections  

New Sizes Launched
We have just taken delivery of a whole new range of stock that will meet the needs of pretty much any project.

You can view the current stock sizes bly clicking the following link, or alternatively contacting us on telephone: +44 (0)845 226 007 or emailing
headquarters
@interpipe.co.uk


Further information



Steel Rule  

BSI Confirms Specification
After a long period of consultation, BSI have now released the new BS EN 10210 standard for Hot finished structural hollow sections of non-alloy and fine grain steels. Technical delivery conditions

BS EN 10210-1 specifies the technical delivery conditions for hot finished hollow sections of circular, square, rectangular or elliptical forms and applies to hollow sections formed hot, with or without subsequent heat treatment, or formed cold with subsequent heat treatment to obtain equivalent metallurgical conditions to those obtained in the hot formed product.

The requirements for tolerances, dimensions and sectional properties are contained in BS EN 10210-2

Should you require any information on how our products meet these new standards, please contact us.



Heathrow Terminal 5  

Heathrow T5
Our sections have been used extensively in the construction of the new BAA Terminal 5 building for the London Heathrow Airport.

Due to come online in 2008, the main terminal building is 396m long by 176m wide by 40m high.

This interior space could accommodate around 50 football pitches.

In total, the construction has used xx,000t of structural steel.

Please contact us for further details.



Stock  

30 Minute Turnaround
Access time to our stock items is greatly reduced thanks to an advanced racking and cranage system. For those in a hurry, access for collection of orders is now 30 minutes from confirmation - guaranteed.

Your cut length material deliveries have also been speeded up considerably with the installation of a new cutting centre. In-house square and mitre cutting is now available in even the largest of sizes.

For delivery – a brand new fleet of vehicles has been commissioned, tracked by satellite and controlled by a logistics specialist.

Please contact us for further details


 
 
 

Newspapers

 
     
 
Interpipe (UK) Limited
14-16 High Street,
Ironbridge,
Shropshire,
TF8 7AD,
United Kingdom
 

 

       
EU Flag
Project part financed by the European Union European Regional Development Fund
 
Interpipe UK Limited
2nd Floor, 14-16 High Street
Ironbridge, Shropshire
TF8 7AD, United Kingdom


Registered in England and Wales
Company No. 01793484
Site and hosting by PWL